Save 20% when you go solar with neighbors — Lock in your discount today!

Save 20% when you go solar with neighbors — Lock in your discount today!

Thumbnail
Case Studie's

Zero-Down Solar: Powering a Farm from Day One

15 kW solar lease cuts costs and powers growth in Sonoma County.

Thumbnail
Case Studie's

Zero-Down Solar: Powering a Farm from Day One

15 kW solar lease cuts costs and powers growth in Sonoma County.


Easy Flow Lease

Off-Grid | No Battery

Sebastopol, Sonoma County – Organic Microgreens Greenhouse

For a new organic microgreens greenhouse in Sebastopol, Sonoma County, a zero-down solar lease is the perfect way to power the startup phase. This solution includes a 15 kW solar array designed to run a 9 kW water pump and the greenhouse's ventilation system during the day.


The Challenge & The Outcome

  • The Challenge: For a small greenhouse supplying high-value microgreens to local restaurants, light but consistent year-round operation is key. In this scenario, the high upfront costs of a traditional diesel generator or a PGE grid connection often become the biggest barrier to getting the business started.

  • The Outcome: The "Easy Flow" lease provides an ideal solution. The farmer gets a complete solar power system with zero down payment for equipment or installation, just a low, fixed monthly rent. This allows the farm to start operating immediately, freeing up crucial startup capital for other parts of the business while eliminating worries about maintenance or fluctuating energy prices.


10-Year Cost Summary (USD)

This table clearly shows the unbeatable advantage of the leasing model for a farmer focused on long-term costs and initial cash flow.

Scenario

Scenario 1: Diesel Generator

Scenario 2: PGE Grid Connection

Scenario 3: Solar Lease (Our Solution)

Equipment/Setup Cost

$25,000

$52,000

$0

Ongoing Annual Cost (Est.)

$7,222

$4,694

$3,840

10-Year Total Cost (Est.)

$97,222

$98,940

$38,400


Why Choose the Easy Flow Lease?

Unlike buying a system outright, the Easy Flow lease is designed for business owners who prioritize cash flow and simplicity:

  • Zero Upfront Investment: Eliminates the need for tens of thousands of dollars in startup costs.

  • Fixed, Predictable Costs: A flat $320 monthly rent locks in your energy costs for the next decade, safe from fuel or electricity price hikes.

  • Maintenance-Free: We handle all system maintenance, repairs, and performance guarantees, so you can focus on farming.

  • Rapid Deployment: No long waits for grid approval or construction. Our systems can be installed and running quickly.


Technical Details

  • Location: Sebastopol, Sonoma County, California

  • Farm Type: Organic Microgreens Greenhouse

  • System Size: 15 kW Solar

  • System Type: Off-Grid Solar Power (Lease Model)

  • Primary Loads: 9 kW water pump and greenhouse ventilation system

  • Key Components:

    • PV Modules: JA Solar 550W × 33

    • Inverter: SMA Sunny Tripower CORE1 (daytime load inverter, no battery)

    • Mounting: Steel ground-mount or rooftop (depending on greenhouse layout)

    • Monitoring: Local EMS controller with mobile app monitoring

    • Grid Protection: Automatic load protection & surge protection


Installation Details

  • Project Timeline: About 3–4 weeks from contract to operation.

  • Installation Type: Ground-mounted system, minimal land use.

  • Permits & Approvals: All permits and approvals handled by our team.

  • Team Credentials: Installed by licensed electricians and certified solar professionals.



Easy Flow Lease

Off-Grid | No Battery

Sebastopol, Sonoma County – Organic Microgreens Greenhouse

For a new organic microgreens greenhouse in Sebastopol, Sonoma County, a zero-down solar lease is the perfect way to power the startup phase. This solution includes a 15 kW solar array designed to run a 9 kW water pump and the greenhouse's ventilation system during the day.


The Challenge & The Outcome

  • The Challenge: For a small greenhouse supplying high-value microgreens to local restaurants, light but consistent year-round operation is key. In this scenario, the high upfront costs of a traditional diesel generator or a PGE grid connection often become the biggest barrier to getting the business started.

  • The Outcome: The "Easy Flow" lease provides an ideal solution. The farmer gets a complete solar power system with zero down payment for equipment or installation, just a low, fixed monthly rent. This allows the farm to start operating immediately, freeing up crucial startup capital for other parts of the business while eliminating worries about maintenance or fluctuating energy prices.


10-Year Cost Summary (USD)

This table clearly shows the unbeatable advantage of the leasing model for a farmer focused on long-term costs and initial cash flow.

Scenario

Scenario 1: Diesel Generator

Scenario 2: PGE Grid Connection

Scenario 3: Solar Lease (Our Solution)

Equipment/Setup Cost

$25,000

$52,000

$0

Ongoing Annual Cost (Est.)

$7,222

$4,694

$3,840

10-Year Total Cost (Est.)

$97,222

$98,940

$38,400


Why Choose the Easy Flow Lease?

Unlike buying a system outright, the Easy Flow lease is designed for business owners who prioritize cash flow and simplicity:

  • Zero Upfront Investment: Eliminates the need for tens of thousands of dollars in startup costs.

  • Fixed, Predictable Costs: A flat $320 monthly rent locks in your energy costs for the next decade, safe from fuel or electricity price hikes.

  • Maintenance-Free: We handle all system maintenance, repairs, and performance guarantees, so you can focus on farming.

  • Rapid Deployment: No long waits for grid approval or construction. Our systems can be installed and running quickly.


Technical Details

  • Location: Sebastopol, Sonoma County, California

  • Farm Type: Organic Microgreens Greenhouse

  • System Size: 15 kW Solar

  • System Type: Off-Grid Solar Power (Lease Model)

  • Primary Loads: 9 kW water pump and greenhouse ventilation system

  • Key Components:

    • PV Modules: JA Solar 550W × 33

    • Inverter: SMA Sunny Tripower CORE1 (daytime load inverter, no battery)

    • Mounting: Steel ground-mount or rooftop (depending on greenhouse layout)

    • Monitoring: Local EMS controller with mobile app monitoring

    • Grid Protection: Automatic load protection & surge protection


Installation Details

  • Project Timeline: About 3–4 weeks from contract to operation.

  • Installation Type: Ground-mounted system, minimal land use.

  • Permits & Approvals: All permits and approvals handled by our team.

  • Team Credentials: Installed by licensed electricians and certified solar professionals.


Achieve More with Less.

Partner with us for a sustainable, cost-effective energy solution that powers your life and work.

Icon
Cost-Effective
Icon
Customizable
Icon
Reliable

Achieve More with Less.

Partner with us for a sustainable, cost-effective energy solution that powers your life and work.

Icon
Cost-Effective
Icon
Customizable
Icon
Reliable

Achieve More with Less.

Partner with us for a sustainable, cost-effective energy solution that powers your life and work.

Icon
Cost-Effective
Icon
Customizable
Icon
Reliable

Create a free website with Framer, the website builder loved by startups, designers and agencies.