OwnFlow Plan Solution

Off-Grid | Battery Storage | Solar Pump

50 kW Off-Grid Solar + Storage for Fresno Vineyard

For a new grape vineyard in Fresno, California, we delivered an all-in-one power system. It combines a 50 kW solar array, 40 kWh of battery storage, and an 11 kW water pump to handle all irrigation needs, plus power for a small home and cold storage.


The Challenge & The Outcome

  • The Challenge: The landowner was ready to start his vineyard in Fresno but hit a wall with traditional power options. High costs, fluctuating energy prices, and long waits for a PGE grid connection put the project on hold, jeopardizing the critical, consistent irrigation that vineyards require.

  • The Outcome: With our all-in-one system, the farm is now 100% energy independent with zero future operating costs. Factoring in tax incentives, the system pays for itself in as little as 6 months when compared to the cost of getting a PGE grid connection.


10-Year Cost Summary (USD)

Scenario

Diesel Generator

PGE Grid Connection

Solar + Storage (Our Solution)

Equipment/Setup Cost

$40,000

$98,000

$120,000

Total Year 1 Cost

$72,000

$118,000

$120,000

Ongoing Annual Cost (Est.)

$32,000

$20,000

$0

10-Year Total Cost (Est.)

$360,000

$298,000

$120,000


Making it Affordable with Tax Incentives

Our solar + storage solution qualifies for significant tax incentives, making the investment even smarter.

  • Original System Cost: $120,000

  • Estimated Tax Savings: -$64,560 (This is a combination of the Federal Investment Tax Credit and accelerated depreciation.)

  • Final Net Cost: $55,440

Disclaimer: Tax savings are an estimate. Please consult your tax professional.


Technical Details

  • Location: Fresno, California

  • System Size: 50 kW Solar

  • Storage Capacity: 40 kWh Battery Storage

  • System Type: Off-Grid Solar, Storage, and Pump System

  • Primary Loads: 11 kW water pump for vineyard irrigation, residential power, small-scale cold storage

  • Key Components:

    • Solar Panels: 86 × LONGi Hi-MO 6 Bifacial 580 W (LR5-72HBD-580M)

    • Battery Storage: 40 kWh BYD Battery-Box Premium LVS (10 × LVS 4.0, LFP)

    • Battery Inverters: 6 × SMA Sunny Island 8.0H-13 (off-grid, 3-phase cluster)

    • PV String Inverter (AC-coupled): SMA Sunny Tripower CORE1 STP 50-US-41

    • Mounting Structure: Unirac GFT ground-mount; hot-dip galvanized steel (ASTM A123), 25+ years corrosion resistance

    • Monitoring: SMA Sunny Portal (ennexOS) + SMA Energy Meter 2.0

    • Rated for: Wind 120 mph (ASCE 7-16, 3-sec gust) / Seismic Design Category D (IBC 2018)


Installation Details

  • Project Timeline: Total time from contract to system operation ≈ 3 months

  • Installation Type: Ground-mounted system; minimal land-use impact; no disruption to vineyard operations

  • Permits & Approvals: We handle all required permits with local authorities and ensure state/federal compliance

  • Team Credentials: Installed by licensed electricians and certified solar professionals; NEC-compliant installation with UL-listed components



OwnFlow Plan Solution

Off-Grid | Battery Storage | Solar Pump

50 kW Off-Grid Solar + Storage for Fresno Vineyard

For a new grape vineyard in Fresno, California, we delivered an all-in-one power system. It combines a 50 kW solar array, 40 kWh of battery storage, and an 11 kW water pump to handle all irrigation needs, plus power for a small home and cold storage.


The Challenge & The Outcome

  • The Challenge: The landowner was ready to start his vineyard in Fresno but hit a wall with traditional power options. High costs, fluctuating energy prices, and long waits for a PGE grid connection put the project on hold, jeopardizing the critical, consistent irrigation that vineyards require.

  • The Outcome: With our all-in-one system, the farm is now 100% energy independent with zero future operating costs. Factoring in tax incentives, the system pays for itself in as little as 6 months when compared to the cost of getting a PGE grid connection.


10-Year Cost Summary (USD)

Scenario

Diesel Generator

PGE Grid Connection

Solar + Storage (Our Solution)

Equipment/Setup Cost

$40,000

$98,000

$120,000

Total Year 1 Cost

$72,000

$118,000

$120,000

Ongoing Annual Cost (Est.)

$32,000

$20,000

$0

10-Year Total Cost (Est.)

$360,000

$298,000

$120,000


Making it Affordable with Tax Incentives

Our solar + storage solution qualifies for significant tax incentives, making the investment even smarter.

  • Original System Cost: $120,000

  • Estimated Tax Savings: -$64,560 (This is a combination of the Federal Investment Tax Credit and accelerated depreciation.)

  • Final Net Cost: $55,440

Disclaimer: Tax savings are an estimate. Please consult your tax professional.


Technical Details

  • Location: Fresno, California

  • System Size: 50 kW Solar

  • Storage Capacity: 40 kWh Battery Storage

  • System Type: Off-Grid Solar, Storage, and Pump System

  • Primary Loads: 11 kW water pump for vineyard irrigation, residential power, small-scale cold storage

  • Key Components:

    • Solar Panels: 86 × LONGi Hi-MO 6 Bifacial 580 W (LR5-72HBD-580M)

    • Battery Storage: 40 kWh BYD Battery-Box Premium LVS (10 × LVS 4.0, LFP)

    • Battery Inverters: 6 × SMA Sunny Island 8.0H-13 (off-grid, 3-phase cluster)

    • PV String Inverter (AC-coupled): SMA Sunny Tripower CORE1 STP 50-US-41

    • Mounting Structure: Unirac GFT ground-mount; hot-dip galvanized steel (ASTM A123), 25+ years corrosion resistance

    • Monitoring: SMA Sunny Portal (ennexOS) + SMA Energy Meter 2.0

    • Rated for: Wind 120 mph (ASCE 7-16, 3-sec gust) / Seismic Design Category D (IBC 2018)


Installation Details

  • Project Timeline: Total time from contract to system operation ≈ 3 months

  • Installation Type: Ground-mounted system; minimal land-use impact; no disruption to vineyard operations

  • Permits & Approvals: We handle all required permits with local authorities and ensure state/federal compliance

  • Team Credentials: Installed by licensed electricians and certified solar professionals; NEC-compliant installation with UL-listed components


Achieve More with Less.

Partner with us for a sustainable, cost-effective energy solution that powers your life and work.

Icon
Cost-Effective
Icon
Customizable
Icon
Reliable

Achieve More with Less.

Partner with us for a sustainable, cost-effective energy solution that powers your life and work.

Icon
Cost-Effective
Icon
Customizable
Icon
Reliable

Achieve More with Less.

Partner with us for a sustainable, cost-effective energy solution that powers your life and work.

Icon
Cost-Effective
Icon
Customizable
Icon
Reliable

Create a free website with Framer, the website builder loved by startups, designers and agencies.